Step 2 of 5
A detailed plan before the first day on site
We turn your requirements into technical drawings, a detailed cost estimate and a realistic schedule, so you know what will be built, what it costs and when it will be ready.
From requirements to a buildable plan
Careful planning is the cheapest way to avoid problems on site. Our architects and engineers prepare the technical documentation, while our project team builds the budget and schedule around it.
What happens in this step
Design and technical drawings
Architectural and engineering drawings that describe exactly what will be built.
Engineering studies and calculations
Structural and technical studies that confirm the design is safe, practical and suited to the site.
Cost estimate
A detailed breakdown of labor, materials, equipment and other costs.
Work schedule
A realistic timeline with key milestones and dependencies between tasks.
Risk and safety planning
Identification of site risks and the measures that will keep people and property safe.
Where this step applies
This step is part of the work we do in these service areas.
Civil Works & Infrastructure
Roads, railways, ports, urban works and heavy civil engineering.
Industrial & Technical Installations
Assembly, maintenance and installation of industrial and building systems.
Engineering & Project Management
Design, engineering and full supervision of construction projects.
Common questions
Can the design change after I approve it?
Changes are possible, but they can affect cost and schedule. We document and price any change before it is carried out.
How detailed is the cost estimate?
It breaks the work down into its main parts, such as labor, materials and equipment, so you can see where the money goes.
Do you work with designs prepared by someone else?
Yes. We can review existing designs, adapt them if needed and build the estimate and schedule around them.
Want a clear plan and budget?
Share your project and our team will prepare the design, estimate and schedule.
Request a quote